918博天堂·(中国)人生就是搏!918博天堂

The performance of MySE5.5-155 in Xinhua Bay Farm

Date: 2024.02.23

In Xinhua Bay Wind farm,The availability of twooffshore MySE5.5-155 wind turbines is over 99.9%,and the total generationof October has already overfilled 4.6GWh.

918博天堂·(中国)人生就是搏!

918博天堂